In order to make the acoustics in this hall variable, a MCR system has been installed besides the possibility to alter the volume of the hall between 5,000m3 and 8,000m3. For this project the design for the MCR system has been made as well as tuning and commissioning of the system.
view at the building (photo Maarten Feenstra)
view at the hall